G. Enhance Arts District Branding with Signage, Murals and Lighting |
H. Enhance Jackson Ward Branding with Signage, Murals and Lighting |
A. Install Bus Shelter at Robinson and Grove |
D. Install Bus Shelter at Robinson and Kensington |
B. Install Bus Shelter at Robinson and Main |
C. Install Bus Shelter at Lombardy Kroger |
E. Improve Crosswalk Safety at Allen Circle |
Note: These projects are arranged in a random order.
G. Enhance Arts District Branding with Signage, Murals and Lighting
This project will increase visibility and recognition of the Arts District (between Belvidere and 1st St.) by installing banners on light poles, a branded art installation, and additional murals. Community members will be engaged in the design process to reflect the area's cultural identity and strengthen ties to Jackson Ward.
Estimated Cost: $200,000
Location: Arts District
H. Enhance Jackson Ward Branding with Signage, Murals and Lighting
This project will increase visibility and recognition of the Jackson Ward by installing banners on light poles, a branded art installation, and additional murals. Community members will be engaged in the design process to reflect the area's cultural identity and strengthen ties to Jackson Ward.
Estimated Cost: $200,000
Location: Jackson Ward
A. Install Bus Shelter at Robinson and Grove
This project will install a new bus shelter equipped with a bench and trash can at this high-traffic stop. Providing adequate shelter will improve passenger comfort, protect riders from the elements, and encourage public transit use.
Estimated Cost: $50,000
Location: Robinson Street and Grove Avenue
D. Install Bus Shelter at Robinson and Kensington
This project will install a new bus shelter equipped with a bench and trash can at this high-traffic stop. Providing adequate shelter will improve passenger comfort, protect riders from the elements, and encourage public transit use.
Estimated Cost: $50,000
Location: Robinson Street and Kensington Avenue
B. Install Bus Shelter at Robinson and Main
This project will install a new bus shelter equipped with a bench and trash can at this high-traffic stop. Providing adequate shelter will improve passenger comfort, protect riders from the elements, and encourage public transit use.
Estimated Cost: $50,000
Location: Robinson Street and Main Street
C. Install Bus Shelter at Lombardy Kroger
This project will install a new bus shelter equipped with a bench and trash can at this high-traffic stop. Providing adequate shelter will improve passenger comfort, protect riders from the elements, and encourage public transit use.
Estimated Cost: $50,000
Location: Lombardy Street
E. Improve Crosswalk Safety at Allen Circle
This project will install a pedestrian crossing signal at the west side intersection of Monument Ave and North Allen Ave (Allen Circle). This improvement aims to reduce pedestrian-related traffic incidents and make the area safer for walkers and cyclists.
Estimated Cost: $120,000
Location: Allen Circle
F. Install Trash Cans in High-Traffic Areas
This project will place additional trash cans in key locations to address the lack of waste disposal in areas hosting public events, such as Art 180, Gallery 5, and 2nd Street. These bins will help reduce litter and maintain cleaner public spaces for residents and visitors.
Estimated Cost: $25,000
Location: Jackson Ward
I. Plant Trees in High Heat-Index Areas in Jackson Ward, Carver, Newtown West and Scott’s Addition
This project will plant trees in Jackson Ward, Carver, Newtown West, and Scott’s Addition to combat urban heat islands caused by excessive pavement and a lack of shade. Increasing tree cover will lower temperatures, improve air quality, and enhance community well-being.
Estimated Cost: $100,000
Location: Throughout 2nd District