You have selected
0 / 0
projects.
Street Resurfacing Projects

This is only a preview. Your vote will not be recorded.

Instructions

  1. Choose the projects you want to support by clicking on the 'Select' buttons.
  2. You can vote for up to 4 projects and 1 vote for the street resurfacing project.
  3. Click the "Submit My Vote" button when you're ready to submit.


Street Resurfacing

Street/Alley/Alley Apron Resurfacing and Sidewalk Repairs

What percentage of the total budget should go toward street/alley resurfacing and sidewalks repairs? (Select one option.)

A resurfaced streets costs $43,500 per block. The first resurfaced alley costs $31,500. Subsequent alleys cost $49,500. An alley apron (the area located at the mouth of the alley, between the sidewalk and the street) costs $10,000. A block of sidewalks costs $75,000. Note: These are the average estimated costs.

Please select one of the options below:

Projects

Jarvis Countdown Crosswalk

Install a countdown crosswalk sign at the northeast corner of Clark and Jarvis to help pedestrians cross Jarvis safely.

Estimated Cost: $20,000

   

Image for Jarvis Countdown Crosswalk

Park Community Bulletin Boards

Install two bulletin boards at Pottawattomie and Touhy Parks to provide information on local events.

Estimated Cost: $14,000

   

Image for Park Community Bulletin Boards

Water Feature at Langdon Park

Install a new water feature at this park at Albion and Ravenswood to allow for fun play and cooling off in the hot summer months.

Estimated Cost: $150,000

   

Image for Water Feature at Langdon Park

Zócalo in Touhy Park (a “zocalo” is the public square of a Mexican city or town)

Build a public plaza/stage at ground level in Touhy Park for cultural expression and community engagement.

Estimated Cost: $40,000

   

Image for Zócalo in Touhy Park (a “zocalo” is the public square of a Mexican city or town)

Park Benches

Replace seven old benches at Loyola, Touhy, Pottawattomie Parks and add a new bench at Sherwin beach.

Estimated Cost: $40,000

   

Image for Park Benches

New Streetlights on Greenview adjacent to Kilmer Elementary and Sullivan High Schools

Replace the old residential streetlights on the 6600 and 6700 blocks of Greenview, from Albion to Pratt, with new, brighter streetlights.

Estimated Cost: $212,000

   

Image for New Streetlights on Greenview adjacent to Kilmer Elementary and Sullivan High Schools

Pratt Bike Lane Extension

Provide striped bike lanes on Pratt from Clark to Ridge. This will allow for an uninterrupted bike lane on Pratt from Sheridan to Kedzie.

Estimated Cost: $30,000

   

Image for Pratt Bike Lane Extension