Make Crossing Safer at Intersection of Muirs Chapel Rd. & Market St.
Project will increase pedestrian safety by providing a crosswalk and signals at the intersection of Muirs Chapel Rd. & Market St. These are busy roads with a large amount of foot traffic as well. Read more...
Estimated Cost: $14,470
Project will increase pedestrian safety by providing a crosswalk and signals at the intersection of Muirs Chapel Rd. & Market St. These are busy roads with a large amount of foot traffic as well.
Increase Pedestrian Safety at Intersection of Spring Garden St. & Elam Ave.
Project will increase pedestrian safety by providing a crosswalk and signals at the 3-way intersection of Spring Garden & Elam Street. This is an area with a high level of foot traffic. Read more...
Estimated Cost: $14,900
Project will increase pedestrian safety by providing a crosswalk and signals at the 3-way intersection of Spring Garden & Elam Street. This is an area with a high level of foot traffic.
Upgrade Brown Bark Park
Add 2-3 pieces of adult exercise equipment and 3 new signs indicating park name. Read more...
Estimated Cost: $40,400
Add 2-3 pieces of adult exercise equipment and 3 new signs indicating park name.
Upgrade Greenway Park in Sunset Hills
In Greenway Park between E. Greenway Dr. and W. Greenway Dr. replace two swing sets, six park benches, four flat benches and three picnic tables. Add 3 pieces of adult exercise equipment. Read more...
Estimated Cost: $70,840
In Greenway Park between E. Greenway Dr. and W. Greenway Dr. replace two swing sets, six park benches, four flat benches and three picnic tables. Add 3 pieces of adult exercise equipment.
Inclusive Playground Equipment at Lindley Park
Installation of up to 3 pieces of accessible playground equipment, wheelchair accessible resurfacing, and additional pathways as needed to ensure access. Final design to include community input. Read more...
Estimated Cost: $37,400
Installation of up to 3 pieces of accessible playground equipment, wheelchair accessible resurfacing, and additional pathways as needed to ensure access. Final design to include community input.